Overhead Cost in Construction Examples: Job-Site vs Office, With a Worked Example

Sort overhead cost in construction examples into job-site and company overhead, then follow an illustrative 40-person contractor from overhead budget to bid.

Diagram of the three construction cost buckets: direct costs, job-site overhead and company overhead

Your overhead percentage sets the markup on every bid you send, and it is only as accurate as the costs you sort into it. A superintendent's truck booked to the office, equipment insurance filed as general and administrative (G&A), a project manager's salary split by habit: each choice moves money between job cost and overhead. The overhead rate changes, and so does every price built on it.

The error compounds. Randy Blount, former owner of Blount Contracting, describes a conversation he has with contractors regularly:

"Oh man, my overhead's 18%. And I'll say, 'Well, what's your gross profit margin?' Like it's around 34% or something. Like, 'Okay. Well, you're not 34% gross profit and you're also not 18% overhead.'"

- Randy Blount, former owner of Blount Contracting, on the CONEXPO-CON/AGG Podcast

In his example, about 10 points of that "overhead" belong at the job level. Jobs look 10 points more profitable than they are, and the company marks up new work on a rate that measures the wrong thing. When volume drops, the real fixed overhead goes unrecovered, and nobody notices until year-end.

This article sorts overhead cost in construction examples into three buckets, gives a rule for the grey-area costs, and follows one illustrative 40-person contractor from its overhead budget to a bid and then to a mid-year recovery check. Benchmarks come from Statistics Canada and the Construction Financial Management Association (CFMA).

What overhead cost in construction includes and what it doesn't

Overhead cost in construction is any cost of running the company that you can't trace to the work on a single job. Accountants split construction costs into three buckets, and the split decides how each cost gets recovered.

The table below shows the three buckets and how each one reaches the client's price.

BucketWhat it isHow it gets recovered
Direct costsLabor, materials, subcontracts and equipment used to build the workEstimated line by line in each bid
Job-site overhead (general conditions, indirect job cost)Costs that exist because a project exists but don't belong to one taskEstimated and coded to the job, like any other cost
Company overhead (G&A, or SG&A in US reporting)Costs that keep the business running whatever jobs are activeAdded to bids as a markup

Blount explains why the line between the second and third buckets matters:

"SG&A from GAAP, Generally Accepted Accounting Principles, should never be charged to a job. They should show up after gross profit."

- Randy Blount, former owner of Blount Contracting, on the CONEXPO-CON/AGG Podcast

Job-site overhead belongs in the job's budget and gross profit. Company overhead sits below gross profit and gets recovered through markup. With that split in place, sorting individual costs becomes straightforward.

Diagram of the three construction cost buckets: direct costs, job-site overhead and company overhead, with how each is recovered

Overhead cost in construction examples, sorted by bucket

The examples below cover the costs most contractors carry, each placed in the bucket it belongs in. Use them to check your chart of accounts line by line.

Table of 11 common construction costs sorted into job-site overhead, company overhead and grey-area costs with allocation rules

Job-site overhead examples

Job-site overhead is any cost created by a specific project that isn't part of one scope of work. Common examples include:

  • Site trailer, site office furniture and site internet
  • Temporary power, water, heat, fencing and toilets
  • Dumpsters and site cleanup
  • Superintendent and site staff time spent on the project
  • Job-specific permits, inspections and builder's risk insurance
  • Site security and project-specific equipment rental

Company overhead examples

Company overhead is any cost you pay to keep the business open, whether you have two jobs running or twenty. Common examples include:

  • Office rent or mortgage interest, utilities and phones
  • Executive, accounting, HR and admin salaries
  • Payroll burden on office staff: CPP, EI, WSIB premiums and benefits (estimate it with the construction labor calculator)
  • Corporate general liability insurance
  • Accounting, legal and audit fees
  • Software, IT and computers
  • Marketing, estimating and bid costs
  • Association dues, licences and training
  • Office vehicles that don't go to sites

Statistics Canada publishes what several of these lines cost as a share of revenue. According to Statistics Canada's Financial Performance Data for construction (NAICS 23, 2024), average costs for businesses with $30,000 to $5 million in revenue were:

Expense lineShare of total revenue
Rent2.0%
Professional and business fees1.9%
Insurance1.4%
Utilities and telephone1.2%
Advertising and promotion1.0%

These figures come from firms smaller than most 20 to 60 person contractors. Use them to sanity-check individual lines, not as a total overhead target.

Grey-area costs and the rule for each

If you can trace a cost to a job through time records, a log or a usage record, charge it to the job. If you can't, it is company overhead. If it is mixed, split it on a written basis you apply every month. Remodeler George Cleary uses the same test:

"Anything that has the guy's time or fuel time for a vehicle going to a job is allocated to that particular job and therefore is not overhead."

- George Cleary, remodeler, in a Professional Remodeler roundtable

The table below applies that rule to the costs teams argue about most.

CostWhere it belongs
Project manager across several jobsJob cost by timesheet hours, remainder to overhead
Superintendent's truckJob cost by mileage or days on site
Small tools and consumablesJob cost when issued to a job, otherwise indirect allocated monthly
Equipment insurance, depreciation and mechanicsEquipment cost, charged to jobs through equipment rates
Estimators and unsuccessful bidsCompany overhead
Warranty workIts original job if open, otherwise company overhead
Flowchart of two questions that decide whether a grey-area cost is charged to the job, split monthly or treated as company overhead

Some costs aren't overhead at all. Materials are direct costs. Loan principal is a balance sheet item. Only the interest and depreciation reach the income statement, as Blount points out. Income tax comes after profit.

Writing these rules down matters most during a system change. Cindy Kleger, Controller at All States Construction, asked peers on the CFMA Connection Café for guidance on "what really is considered a job cost" while migrating to new software and rebuilding her chart of accounts.

Once costs sit in the right buckets, the company overhead total becomes a number you can price from.

Worked example: turning an overhead budget into a bid

Divide your annual company overhead budget by planned revenue or planned direct cost to get an overhead rate, then add that rate and your profit target to each job's direct cost. The example below uses illustrative figures in Canadian dollars for a 40-person Ontario general contractor.

The company's annual overhead budget looks like this:

Overhead line (illustrative)Annual budget
Office and admin salaries$1,050,000
Payroll burden on office salaries$190,000
Office rent and utilities$150,000
Corporate insurance$90,000
Software and IT$80,000
Accounting and legal$70,000
Marketing and business development$60,000
Office vehicles$45,000
Other$55,000
Total$1,790,000

The company plans $16,000,000 in revenue and a 5% profit of $800,000. That leaves $13,410,000 of planned direct cost, including job-site overhead.

The same overhead gives two different rates depending on the base:

  • Overhead as a share of revenue: $1,790,000 ÷ $16,000,000 = 11.19%
  • Overhead as a share of direct cost: $1,790,000 ÷ $13,410,000 = 13.35%

Both are correct. State the base every time you quote an overhead percentage, or you'll compare numbers that measure different things.

Now the company prices a job with $1,200,000 of direct cost. The markup on cost that recovers overhead and profit is ($1,790,000 + $800,000) ÷ $13,410,000 = 19.31%. Applied to this job, that adds $1,200,000 × 19.31% = $231,767, for a bid of $1,431,767. Overhead and profit make up 16.19% of that price, which is the margin. Use the Buildend markup and margin calculator to convert between the two.

A borrowed "cost plus 10%" prices the same job at $1,320,000, which is $111,767 lower. That bid doesn't cover this company's overhead, let alone its profit.

Illustrative waterfall showing a $1,200,000 job plus company overhead and profit becoming a $1,431,767 bid, compared with a cost plus 10% bid

To compare your rate with peers, use a published benchmark with a clear definition. According to the CFMA 2026 Construction Financial Benchmarker executive summary, SG&A averaged 11.2% of revenue across 1,359 US contractors in fiscal 2025, 9.2% for Best in Class firms and close to 15% for specialty trade contractors. SG&A excludes job-site overhead, so compare it with your company overhead bucket only.

This bid only recovers overhead if the revenue plan holds. Dave Jurinic describes the same dependency:

"I have to account for these costs and set an annual budget. I then have to predict how many renovations and custom homes I will build that year so that I can apply these costs on every project above the actual construction and management costs."

- Dave Jurinic, Director of Operations at Toronto Custom Concepts, on RenoMark

That forecast is the weak point, and it is why the next check matters.

Worked example: checking overhead recovery at mid-year

Compare the overhead you have recovered through billed work with the overhead you have actually spent, every month. The same illustrative contractor runs this check at June 30:

Mid-year check (illustrative)Amount
Planned revenue, January to June$8,000,000
Revenue billed, January to June$6,400,000
Overhead recovered at 11.19% of revenue$716,000
Overhead spent (half of the annual budget)$895,000
Under-recovered overhead$179,000

Revenue is 20% behind plan, but most overhead is fixed, so the company is $179,000 short with six months left. If billing stays behind plan, the gap keeps growing at the same rate.

Illustrative chart of cumulative overhead spent versus recovered from January to June, with $179,000 under-recovered by June 30

The response follows three steps:

  1. Separate fixed and discretionary lines. Rent and core salaries stay. Marketing, software seats and training budgets can move.
  2. Reprice new bids on the revenue you now expect instead of the original plan.
  3. Check backlog against the second-half plan to see whether the gap closes or widens, and update your cash flow forecast with it.

Contractors who skip this check find the gap at year-end. Bob DuBree of Creative Contracting cut overhead from about $450,000 to about $150,000 over the same January to November period a year apart, after work dried up in the 2008 downturn. He also names the opposite problem:

"When you get busy, you get fat. You get fat on the overhead side."

- Bob DuBree, Creative Contracting, in a Professional Remodeler roundtable

Run a creep check once a year as well. Compare each overhead line with last year's, the same way you track a project budget, and compare overhead growth with revenue growth. A new office, new hires or new software raise the rate permanently. Both checks depend on one thing: the numbers in the job budget and in accounting have to describe the same costs.

Keeping overhead examples consistent from estimate to accounting

Use the same cost codes in estimating, field coding and accounting, and control who can move a cost between a job and overhead. If the estimate codes job-site overhead one way and accounting files it another way, you can't compare estimate with actual, and the overhead rate drifts.

Custom builder Jeremy Sloane puts the cost of getting this wrong in plain terms:

"If that money is in the wrong bucket, I could be off when I budget a job by thousands and thousands of dollars."

- Jeremy Sloane, Sloane Construction Company, on Adaptive's Builders, Budgets & Beers

Three practices keep the buckets consistent:

  • Code job-site overhead to the job budget under its own cost codes, as described in construction cost codes explained.
  • Allocate indirect costs to active jobs monthly on one documented basis, such as labor dollars from time tracking.
  • Limit who can recode a cost between a job and overhead, and keep a record of each change.
Diagram of job-site overhead cost codes carried from estimate to job budget to accounting, with company overhead kept in accounting

Buildend supports this workflow. Buildend job costing uses the same cost codes for budgets and financial records, shows budgets, commitments and projected cost in one project view, and has configurable approval workflows and permissions. Your accounting system stays the system of record through integrations with QuickBooks Online and Desktop, Sage 100 and 300, and Yardi. Company overhead stays in accounting, and job-site overhead sits in the job budget where project teams see it.

Common questions about overhead cost in construction

What is considered overhead cost in construction?

Overhead cost in construction is any cost of running the company that you can't trace to one job, such as office rent, admin salaries, corporate insurance and accounting fees. Job-site costs like the trailer and superintendent belong to the job.

What is the typical overhead cost for a construction company?

According to the CFMA 2026 Benchmarker, SG&A averaged 11.2% of revenue for US contractors in fiscal 2025. Specialty trades ran close to 15%. These figures exclude job-site overhead.

What is a good overhead percentage?

A good overhead percentage is one your bids fully recover at your actual volume. Compare your rate with your own plan each month before comparing it with a benchmark, and state the base you divide by.

Conclusion

Overhead cost in construction examples are only useful once each one sits in the right bucket. Sorting job-site and company overhead correctly gives you a true overhead rate. Pricing from your own overhead budget gives you a markup that covers it. A monthly recovery check tells you whether volume is keeping up.

Start today with one step: pull last year's income statement and mark every expense line as direct, job-site overhead or company overhead using the rule above. Recalculate your overhead rate from the company overhead lines only, then compare it with the markup in your current bids.

To see how job-site overhead, budgets and commitments sit together in Buildend's financial management, bring one job to a Buildend demo.

See Buildend on a real workflow.
Book a demo ↗

See Buildend's Construction Management Platform in Action

Ready to experience firsthand how our construction management software can transform your projects? Request a demo now and discover the simplicity, efficiency, and control Buildend brings to your team.

Request a Demo